P.E.I. wind turbines at 'high risk of imminent failure,' consultant warned province in 2022

WNews
WNews 1 Min Read

A consultant hired in 2022 to assess production problems at a wind farm owned by the P.E.I. government found severe damage, with turbine units possibly constituting a safety hazard and turbine blades at “high risk of imminent failure.”

Last month, high winds ripped two 56-metre blades off one of the turbines at the facility in Hermanville, near the northeastern tip of Prince Edward Island. For comparison, the province’s tallest building is only 39 metres tall; it’s the 10-storey Holman Grand Hotel in Charlottetown. 

A provincial spokesperson said the turbine was not operational at the time, and was scheduled for repairs in April 2024. The province

Share This Article
Leave a comment
Report a Bug/Suggest Feature

Notice a bug on the site or want to suggest a feature. Please fill out the information below and one of our IT will look at the bug/feature report. If we have any questions or want more information, we will reach out vis email.

Reading: P.E.I. wind turbines at 'high risk of imminent failure,' consultant warned province in 2022

(C) 2012 – 2024  | WNews Broadcasting Corp, a W-World Company | All Rights Reserved

Connect
with Us

Report a Error with this Story

Notice a error or facts with this story, please submit the information below and someone from our newsroom will review it and change if required 

Beta

Welcome to The New W.News

It is with great pleasure that we welcome you to W.News 6, the most extensive update ever. Please bear with us as we continue to work on and fine tune the new site. WNewsNetwork.com will remain online until June 30, 2024.