B.C. Hydro dam project wants to leave construction debris at bottom of Peace River

WNews
WNews 1 Min Read

When B.C. Hydro’s Site C dam floods an 80 kilometre-long swathe of the Peace River valley to generate electricity, the company says it wants to leave behind 45 pieces of structural construction debris on the riverbed. 

In a written submission to the B.C. Environmental Assessment Office, B.C. Hydro states the structures that would be flooded and left underwater may include portions of causeways, gravel pads, concrete abutments and riprap from bridge construction, diversion channels with rock-filled gabions, a barge pad, a boat ramp, access roads, and giant concrete anchors each covering more than a hectare. 

The Peace River, between Hudson’s Hope and Fort St John,

Share This Article
Leave a comment
Report a Bug/Suggest Feature

Notice a bug on the site or want to suggest a feature. Please fill out the information below and one of our IT will look at the bug/feature report. If we have any questions or want more information, we will reach out vis email.

Reading: B.C. Hydro dam project wants to leave construction debris at bottom of Peace River

(C) 2012 – 2024  | WNews Broadcasting Corp, a W-World Company | All Rights Reserved

Connect
with Us

Report a Error with this Story

Notice a error or facts with this story, please submit the information below and someone from our newsroom will review it and change if required 

Beta

Welcome to The New W.News

It is with great pleasure that we welcome you to W.News 6, the most extensive update ever. Please bear with us as we continue to work on and fine tune the new site. WNewsNetwork.com will remain online until June 30, 2024.